Cann River P-12 College

Location
20-24 Tamboon Rd Cann River 3890

Permanent Modular School Buildings Program

  • Start

    Q2 2019
  • Planning

  • Design

  • Construction

  • Finish

    Q4 2020

The above dates are forecast only and subject to change.

About the project

We replaced an older building containing asbestos with a new architecturally-designed permanent modular building.

The new building features general purpose classrooms, an accessible toilet and perimeter decking.

Funding

In the 2019–20 State Budget, the school received $2.057 million through the Permanent Modular School Buildings Program.

Funding type

  • Permanent Modular School Buildings Program

Updated