Upgrade and Modernisation - 2023–24 Funding
-
Start
Q2 2023
-
Planning
-
Design
-
Construction
-
Finish
Q1 2026
About the project
Upgrade and Modernisation – Blocks A, C and D
-
Start
Q4 2020
-
Planning
-
Design
-
Construction
-
Finish
Q1 2023
About the project
We upgraded Block A, Block C (admin and library) and Block D. We undertook maintenance and roof works to Block E.
The upgrades help the school to:
- create a dynamic teaching environment with spaces that offer flexibility for team teaching
- remove congestion in corridors by providing designated locker spaces
- create welcoming and inviting staff hubs that foster creativity and community
- encourage staff and students’ wellbeing
From the 2020–21 Infrastructure Planning and Acceleration fund, the school was allocated $558,000 in planning funding. In the 2020-21 State Budget, the school received $5.018 million.
Upgrade and Modernisation
-
Start
-
Planning
-
Design
-
Construction
-
Finish
Q1 2018
About the project
We upgraded and modernised Emerald Secondary College.
These works developed an Inclusion and Learning Centre, modernised the library and redeveloped the technology and performing arts areas. We delivered an enlarged and re-equipped canteen and expanded the facilities within the performing arts building.
The project also included the repair and upgrade of storm water drains, pipes, roofs, windows and doors. The upgraded facilities ensures that all students' physical, intellectual, mental health, social and overall wellbeing needs are supported.
In the 2015-16 State Budget, $1.5 million was allocated to the school. A further $500,000 was allocated to the school from the 2017-18 Planned Maintenance Program.