Goodstart Early Learning Bundoora Plenty Road

Location
3/5 Plenty Rd Bundoora 3083

Building Blocks Inclusion – Buildings and Playgrounds

  • Start

    Q1 2026
  • Planning

  • Design

  • Construction

  • Finish

    Q1 2027

The above dates are forecast only and subject to change.

About the project

We're helping upgrade the outdoor playspace. The works will make it more inclusive for children of all ages and abilities.

The centre will build a sensory garden, sandstone stepping pads and shaded, raised garden beds. They’ll also add a cubby house that is accessible for all children.

The existing sandpit will be upgraded with a widened entry point, mud kitchen, and water play station. A new turfed area will also be built under the existing shade sail. The existing astro turf will also be replaced with polished concrete. The verandah will be resurfaced for a level indoor-outdoor transition.

The boundary fence and evacuation gates will also be upgraded to improve safety.

Funding

In the 2025–26 Building Blocks Inclusion Grant – Buildings and Playgrounds Stream, $200,000 was allocated to this project.

Funding type

  • Building Blocks Inclusion Grant