Goodstart Early Learning Bundoora Plenty Road

Location
3/5 Plenty Rd Bundoora 3083

Building Blocks Inclusion – Buildings and Playgrounds

  • Start

    Q1 2026
  • Planning

  • Design

  • Construction

  • Finish

    Q3 2026

The above dates are forecast only and subject to change.

About the project

We helped upgrade the outdoor playspace. It is now more inclusive for children of all ages and abilities.

The centre built a sensory garden, sandstone stepping pads and shaded, raised garden beds. They also added a cubby house that is accessible for all children.

The sandpit was upgraded with a widened entry point, mud kitchen, and water play station. A new turfed area was also built under the existing shade sail. The astro turf was replaced with polished concrete. The verandah was resurfaced for a level indoor-outdoor transition.

The boundary fence and evacuation gates were also upgraded to improve safety.

Funding

In the 2025–26 Building Blocks Inclusion Grant – Buildings and Playgrounds Stream, $200,000 was allocated to this project.

Funding type

  • Building Blocks Inclusion Grant