Lollypop Creek Specialist School (interim name) – construction update

This video shows construction at the schools.

The only audio on this video is upbeat instrumental music. 

The video starts with an aerial view panning across the construction site. The site is ringed by a paved road and is surrounded by fields. The ground is brown dirt. We see some concrete slabs and construction offices. 

A design overlay of text flags mark the location of two schools on the site. 

[On-screen text: Lollypop Creek Specialist School (interim name). Opening Term 1, 2024]

[On-screen text: Lollypop Creek Secondary School (interim name). Opening Term 1, 2024]

We see a close-up of a large concrete slab and wooden structures. The video then shows a series of construction scenes, including heavy digging equipment and trucks, plastic pipes emerging from the ground, and workers on site. 

The final shot pulls back to an aerial view of the site.

A white background appears with the VSBA and Victoria State Government logos. 

[On-screen text: www.schoolbuildings.vic.gov.au

A black background appears and white text appears. 

[On-screen text: Authorised by The Victorian School Building Authority, 33 St Andrews Place, East Melbourne] 

[Transcript ends] 

Updated