Northcote High School

Location
St Georges Rd Northcote 3070

Upgrade and Modernisation - next stage

  1. Start

    Q2 2021

  2. Planning

  3. Design

  4. Construction

  5. Finish

    Q2 2024

The above dates are forecast only and subject to change.

About the project

We are delivering the next stage of the master plan for the school, which includes a new multipurpose learning building with specialist learning facilities.

Funding

In the 2021–22 state budget, the school received $8.007 million to deliver a multi-purpose learning building with specialist learning facilities.

In the 2022–23 state budget, the school received an additional $8.747 million to deliver the new building as a three-storey STEM and library building

The school has also contributed over $400,000 to the works.

In 2022, $2.3 million was allocated to deliver 2 new double-storey relocatable buildings and to remove an excess single-storey relocatable building.

Funding type
Upgrade and Modernisation

Northcote High School - site plan, ground floor

Northcote High School - site plan, ground floor

This image shows the site plan for the Northcote High School new 3-storey STEM and library building. This is the ground floor.

The following areas are marked up:

  • entry
  • library
  • stairs x 2
  • bathrooms x 2
  • administration
  • learning space
  • student services
Download Northcote High School - site plan, ground floor

Northcote High School - site plan, level one

Northcote High School - site plan, level one

This image shows the site plan for the Northcote High School new 3-storey STEM and library building. This is level one.

The following areas are marked up:

  • science lab
  • stairs x 2
  • a bathroom
  • administration
  • outdoor learning
  • learning space x 3
Download Northcote High School - site plan, level one

Northcote High School - site plan, level two

Northcote High School - site plan, level two

This image shows the site plan for the Northcote High School new 3-storey STEM and library building. This is level two.

The following areas are marked up:

  • science lab
  • stairs x 2
  • a Bathroom
  • administration x 2
  • outdoor learning
  • learning space x 3
Download Northcote High School - site plan, level two

Upgrade and Modernisation - Performance Hub

  1. Start

    Q4 2017

  2. Planning

  3. Design

  4. Construction

  5. Finish

    Q1 2019

The above dates are forecast only and subject to change.

About the project

We built a new Performance Hub at the school. This reflected the school's long term vision to have a campus that better caters for contemporary learning and their growing student community.

Located on the corner of the campus, the Performance Hub is a place for the whole student community – an inspiring and outward-facing environment for music and theatre programs, and f or enabling learning through performance. It accommodates teaching and learning areas for the Music School and Drama and Theatre Studies, including planning and support facilities, social spaces and amenities. Flexible VCE facilities, including study and meeting areas, are also part of the hub.

This project, designed by Kerstin Thompson Architects, was the winner of 'Best Project Under $5 Million' in the 2019 Victorian School Design AwardsExternal Link . It was also recognised as a finalist in the 'Completed buildings - school' category at the 2019 World Architecture FestivalExternal Link .

Funding

In the 2016–17 State Budget, $1.5 million was allocated to the school.

In the 2015–16 State Budget, $3 million was allocated to the school.

Funding type
Upgrade and Modernisation

Reviewed 22 November 2022